MWS Mafumeira Sul Project - Quayside Operations

Posted by: Global Maritime | Date: March 1, 2016

Client: Chevron

Timeline: 2014 - 2016

American Global Maritime was the MWS contractor for Chevron overseeing the loadout, transportation and installation of platforms, infrastructure, equipment and facilities to develop the Mafumeira field through the Mafumeira Sul Project (MSP).

The Mafumeira field is located off the Angolan coast within the CABGOC Block 0, in the southern portion of the concession Area A.

The following loadouts were attended by MWS and COA's were issued with zero incidents:

- HTV Osprey, Talisman & Triumph were utilized for the loadouts in Korea for the 5 topside modules.

- Barges were utilized for the loadouts of 4 Jackets, piles and 2 WHP topsides in Angola.

- HTV Swan was utilized for the Living Quarters Building loadout in Mexico.

- MV Happy Sky was utilized in China for the loadout of the flare and LQP bridge.