MWS for Chengbei Oilfield Equipment and Facilities Overall Upgrade Modification Project

Posted by: Global Maritime | Date: September 1, 2016

Client: CNOOC Tianjin

Timeline: 2015 - 2016

Chengbei Upgrade Project involves the following activities:

- Remove 3 crude oil storage tanks in CB-BSL platform and modify BSL platform to a CEP

- Build a mixture pipeline, a composite sub-cable and a water injection pipeline

As the nominated MWS, GM China reviewed the procedure and calculation documents, and witnessed all the load-out, transportation and installation operation of platforms, pipeline and cable.