MWS Ekofisk Cessation Project

Posted by: Global Maritime | Date: July 1, 2013

Client: ConocoPhillips Norway

Timeline: 2008 - 2013

Global Maritime provided Marine Warranty Surveyor services from 2008 through 2013 for the removal of totally 11 fixed jacket platforms on the Ekofisk Field using a reverse installation methodology.

Services provided by Global Maritime include:

- Appraisal studies involving design, methodology and procedures for the removal of jackets and topsides by heavy lift vessels

- Review and approval of documentation and procedures

- Marine safety and suitability inspections of vessels engaged in decommissioning activities.

- Offshore attendances by Master Mariners and engineers during removal activities and load-in at the disposal facility

- Providing approval of operations during site attendances

Interested in more news and updates from Global Maritime?