Client: JFD Ltd. (Divex)
Timeline: 2016
Diving system, FMECA, diving
This vendor’s FMECA project has proven our ability to perform multidisciplinary tasks. Experience gained at previous diving projects could be utilized in assessment of the Divex’s delivery.
The system is going to be installed on DP2 class vessel built for British Petroleum. Worldwide leading diving system included both saturated and surface systems supporting up to 18 divers. The system contains all life support subsystem including two submersible chambers, dive, air and sat control stations, and typical gas management system, heating or communication.