Client: Wintershall
Timeline: 2016
Installation of ITS Template at Kristin Field
The scope of work covered the load out and installation of 2 ITS Templates, Weight: 270 tons.
The scope attendance included weather monitoring due to restrictions in environmental criteria´s for installations. The installation was executed with Normand Oceanic.
The Maria field is located at 300 meter water depth in the Halten Terrace area of the Norwegian Sea.