Global Maritime was engaged by Statoil Petroleum AS on the Sheringham Shoal Cathodic Protection Retrofit Project as follows:

- Conceptual Study, performed by GM in 2012.

- FEED Study, performed in 2013

- Pilot installation, initiated in 2013, performed May 2014

- Marine Engineering and Offshore Operations Management Services where GM engineer, plan, coordinate and execute the installation of additional cathodic protection on all 88 wind mills and 2 offshore substations.

Project execution from May through September 2014.