Client: Statoil / Equinor
Timeline: 2012 - 2014
Global Maritime was engaged by Statoil Petroleum AS on the Sheringham Shoal Cathodic Protection Retrofit Project as follows:
- Conceptual Study, performed by GM in 2012.
- FEED Study, performed in 2013
- Pilot installation, initiated in 2013, performed May 2014
- Marine Engineering and Offshore Operations Management Services where GM engineer, plan, coordinate and execute the installation of additional cathodic protection on all 88 wind mills and 2 offshore substations.
Project execution from May through September 2014.