Client: Preline Fishfarming Systems (Lerøy)

Timeline: 2015 - 2016

Global Maritime has been responsible for the hydrodynamic design and all hydrodynamic analyses on the concept development of Preline’s closed fish-farm (also known as the Lerøy Pipe-farm).

We have been involved from the start of the project, and our activities can best be summarized as follows:

- Hydrodynamic Design

- Transport & Installation Analyses

- Project Management (Parts of Scope)

- Structural Analyses

- Model Testing

- CFD Analyses

To learn more about this project: Read more here