MWS Maria Subsea Development

Written by Global Maritime | Apr 1, 2016 7:10:00 AM

Client: Wintershall

Timeline: 2016

Installation of ITS Template at Kristin Field

The scope of work covered the load out and installation of 2 ITS Templates, Weight: 270 tons.

The scope attendance included weather monitoring due to restrictions in environmental criteria´s for installations. The installation was executed with Normand Oceanic.

The Maria field is located at 300 meter water depth in the Halten Terrace area of the Norwegian Sea.