Installation of a Submerged Turret Production Buoy

Written by Global Maritime | Sep 20, 2016 10:23:00 AM

Client: Ocean Installer

Timeline: 2015 - 2016

Global Maritime's Aberdeen office worked alongside our partners at Vryhof Anchors to deliver a time sensitive installation of a Submerged Turret Production Buoy for Ocean Installer.

The buoy was transported to the field, lifted into the water and connected to the moorings in the Aje Field offshore Lagos, Nigeria.

GM was involved in multiple levels of the design, operations and safety considerations throughout the installation.

Our technical expertise in previous projects was a valuable resource as the project was done in only 8 weeks and would normally be done in 6-8 months.