Installation of 3 flexible Risers for Mardura BD | Global Maritime

Written by Global Maritime | Aug 14, 2017 10:18:00 AM

Client: Boskalis

Timeline: 2017

Global Maritime Singapore (GMS) performed the engineering simulation study for the installation of the Multi Phase Riser, the Gas Export Riser and the Umbilical.

GMS engineers worked closely with Boskalis to perform the motion analysis for the Riser Installation Vessel using HydroD and to carry out static and dynamic analysis using OrcaFLEX.